Hui Energy · Technical reference

Foshan Junming Plaza · Reference

Materials show meters, chillers and control enclosures, with alternating-mode tests in October–November 2025.

Hui Energy · Technical reference

See how the equipment is used on site.

These photos and project details come from Hui Energy materials as technical application references.

Hui Energy · Technical reference
Hui Energy · Technical reference
Hui Energy · Technical reference
Read the original Hui Energy materials ↗

Start with a pilot. Measure the outcome.

01

Set the measurement boundary and baseline

02

Connect and pilot a small area

03

Adjust for conditions; review benefits

04

Expand after verification

Electricity savedBill impactOperational emissions impact

Adjust energy savings for weather, runtime and load. Use local tariffs for costs and region-, year- and boundary-specific factors for operational emissions.

IPMVP ↗
Explore the solution
Project-specific configuration

Bring your equipment list. We’ll review the configuration.

Assess my site