Hui Energy · Technical reference
Foshan Junming Plaza · Reference
Materials show meters, chillers and control enclosures, with alternating-mode tests in October–November 2025.
See how the equipment is used on site.
These photos and project details come from Hui Energy materials as technical application references.
Read the original Hui Energy materials ↗Start with a pilot. Measure the outcome.
01
Set the measurement boundary and baseline
02
Connect and pilot a small area
03
Adjust for conditions; review benefits
04
Expand after verification
Electricity savedBill impactOperational emissions impact
Adjust energy savings for weather, runtime and load. Use local tariffs for costs and region-, year- and boundary-specific factors for operational emissions.